  • Design, fabricate, supply and erection of steel framing and decking for 70 floors.                            <br>Main Contractor: Al Seal Contracting Co.                            <br>Year: 2005
  • Design, fabricate, supply and erection of steel framing and decking for 2 towers each 57 storey and 11 storey car park.<br>Main Contractor: Al Seal Contracting Co.<br>Year: 2007
  • Design, fabrication, supply, erection and fire proofing of steel framing for the residential tower. Steel work and framing for 46 floors.<br>Main Contractor: HBK Contracting.<br>Year: 2007
  • Design, fabrication, supply, erection and fire proofing the steel framing for the residential tower, steel work and framing for 46 floors.<br>Main Contractor: AL Seal Contracting Co.<br>Year: 2007
  • Design, fabricate supply and erect the steelwork for the Al Bida tower crown (levels 40 to 45).<br>Main Contractor: Higgs & Hill W.L.L.<br>Year: 2008
  • Design, fabricate, supply and erect the steel framing for conference building, conference stairs, showroom framing, building stairs, intermediate framing columns, receivers, entrance framing , roof louver framing, BMU support, additional Main steel columns, conference building roof pump room, ladders and covers, curved wall framing.<br>Main Contractor: Redco Construction - Al Mana<br>Year: 2009
  • Design, fabrication, supply, delivery and erect the structural steel works including sections and decking for mezzanine floor, first floor, second floor, roof, radial dome, octagonal dome and Main entrance.<br>Main Contractor: Power Line Engineering - Qatar W.L.L.<br>Year: 2009
  • Design, fabrication, supply and erection of steel framing for the Nobu restaurant at The Pearl Qatar.<br>Main Contractor: TERNA Qatar L.L.C.<br>Year: 2010
  • Design and construction of pre-engineered steel building for the fire station and workshop.<br>Main Contractor: Orientals Enterprises<br>Year: 2006
  • Fabricate, supply and fix steel framing for bicycle track for Asian Games Doha 2006.<br>Client: DAGOC<br>Year: 2006
  • Design, fabrication, supply and erection of atrium steelwork using circular sections and steel plates.<br>Main Contractor: Gulf Contracting Co.<br>Year: 2008
  • Design, Fabrication, supply and Erection of Rockwool insulated double standing seam roofing framework system.<br>Main Contractor: Boom General Contractors<br>Year: 2008
  • Design, Fabrication, Supply and Erection of Steel Framing, Wall & Roof Cover.<br>Main Contractor: Orientals Enterprises<br>Year: 2005
  • Design, Fabrication, Supply and Erection of Structural Steel for Lift structure, Roof decking, Eve canopy, Composite metal deck, Escape stairs, Escape Steel bridges.<br>Main Contractor: Al Huda Engineering Works<br>Year: 2015
  • Supply and erect steel plate girders, grillages, Stanchions, columns, Portal frames, Roof members, Braces, Struts, rails, Staircase, steel stringer beam, steel plate, balustrade, steel mesh for treads and landings, Metal decking, sundries including all primary members, secondary members, bolts and nuts, angles, connections, drilling mortices in concrete and holding down bolts to walls and beams.<br>Main Contractor: Gulf Contracting Co.<br>Year: 2014
  • Design, Fabrication, Supply & Installation of Steel Framing for FEC Zone 5C, Atrium East, Cinema, Control Room, Stud Firing, Toy Store, Decking Sheet, Slab Staircase & Decking at FEC.<br>Main Contractor: Urbacon Trdg & Contg.<br>Year: 2015
  • Re-design, fabricate, paint, supply, erect and fire proof steel work for the New floors and fire proofing in Cementacious material. Decking with Metalex MD 50-0.8 S235/Z180-275.<br>Main Contractor: Derwind Trad & Contg. Co.<br>Year: 2016
  • Re-design, fabricate, paint, supply, erect and fire proof steel work for the New floors and fire proofing in Cementacious material. Decking with Metalex MD 50-0.8 S235/Z180-275.<br>Main Contractor: Derwind Trad & Contg. Co.<br>Year: 2016
  • Design, Fabricate, Supply and Installation of Middle truss of length = 58.5m, depth = 1.75m, width = 2.7m. Middle truss fully welded and supported on 2nos. steel towers of Height = 17.2m, front width = 1.5m, side width = 2.7m bolted above concrete shaft. The framing includes. Main runners to support the cladding sub frame.<br>Main Contractor: Kittco Contracting Co.<br>Year: 2014
  • Fabricate, supply and erection of Steel framing and decking for closing the three first floor voids at the Clinic extension.<br>Main Contractor: Al Huda Engineering Works<br>Year: 2015
  • Design, Fabrication, supply and Erection of Sail & Grid system. Roof system comprising steel framing and aluminium Honey comb cover.<br>Main Contractor: Gulf Contracting Co W.L.L.<br>Year: 2012
  • Design, Fabricate, supply and installation of anodised finish Aluminium covers. Interlocking extruded aluminum planks are of Grade 6063 T6 and silver anodised.<br>Main Contractor: Lotus<br>Year: 2012
  • Design, fabricate, supply and erection of Steel Structure and cladding for 2 Screens<br>Main Contractor: Salam media cast<br>Year: 2008
  • Fabrication, delivery to site and installation of Structural Steel Bridges including metal decking with galvanized Metalex MD 50; 0.8mm thickness, Galvanized and Painted for GA areas at Podium Level<br>Main Contractor: BMJ Qatar<br>Year: 2013
  • Design, fabricate and supply and fixing of Aluminium platforms and gratings using Interlocking extruded aluminum planks.<br>Main Contractor: Al Jaber<br>Year: 2012
  • Design, fabrication, supply and erection of Steelwork framing for Seating Area, Decking and Roof structure works.<br>Main Contractor: Business Trading Company.<br>Year : 2009
  • Design, fabrication, supply and erection of Seating Area, Decking, Acoustic wall and Roof structure works.<br>Main Contractor: QBIC<br>Year : 2014
  • Design, fabrication, supply and erection of Seating Area, Decking, Acoustic wall and Ceiling support works.<br>Main Contractor: QBIC<br>Year : 2014
  • Design, fabrication, supply and erection of Seating area, Ramps, Decking and Stair works.<br>Main Contractor: Urbacon Trdg & Contg.<br>Year : 2015
  • Design, fabricate, paint, supply and erection of tent fabric with support of banana truss and steel ropes.<br>Main Contractor: GETTCO<br>Year: 2000
  • Design, fabricate, paint, supply and erection of tensile fabric shade, supporting steel structure and stainless steel wire ropes.<br>Main Contractor: CITY<br>Year: 1997
  • Design, fabricate, supply and installation of space framing ceiling structure using polyester reinforced fabric, steel framing support and S.S. wire rope at Junior school Sports facilities and cafeteria.<br>Main Contractor: MIDMAC<br>Year: 1998
  • Design, fabricate, supply and installation of fabric tents and steel framing support and S.S. wire rope.<br>Main Contractor: QBEC<br>Year: 1999
  • Design, fabricate, supply and installation of fabric tents and steel framing support and S.S. wire rope.<br>Main Contractor: QBEC<br>Year: 2002
  • Design, fabricate, supply and installation of steelwork and fabric cover for Tensile Canopies at Play Area. Polyester reinforced tensile canopies support fixed to steel framing.<br>Main Contractor: MIDMAC<br>Year: 2004
  • Design, fabricate, supply and installation of steelwork and fabric cover shade. Size - 18 m Diameter x 5.2 m high. Size - 10 m Diameter x 7.25 m high.<br>Main Contractor: Al Mana Engineering<br>Year: 2008
  • Design, Manufacture and install Structural Steel Support structure and reinforced Fabric Shade Canopies to Gate House, Personnel Access and Car Parking Area.<br>Main Contractor: KBAS Contracting, Trading & Industrial Co.<br>Year: 2009
  • Design, manufacture and install Structural Steel Support structure and reinforced Fabric Shade Canopies to Gate House, Personnel Access and Car Parking Area.<br>Main Contractor: KBAS Contracting, Trading & Industrial Co.<br>Year: 2009
  • Design, fabricate, paint, supply and erect polyester reinforced fabric tent with supporting steel framings. 4 small tent and 1 large tent.<br>Main Contractor: Al Alia Trading & Contracting.<br>Year: 2010
  • Fabric shade for children play ground, Main Plaza, Wavy tent and entrance tent at Barzan and Sumaisma Social & Cultural Centers.<br>Main Contractor: International Trading & Contracting.<br>Year: 2010
  • Design, manufacture and install Canopy structure, polyester powder coated steel framework, RAL 9010 pure white, and Ivory PVC reinforced polyester membrane treated with self-cleaning sky clear coat SCC125-J by Taiyo Kogyo Corporation.<br>Main Contractor: REDCO Al Mana<br>Year: 2012
  • Design, fabricate, paint, supply and erect steelwork, fabric cover for external shades.<br>Main Contractor: REDCO Al Mana<br>Year: 2012
  • Pre-engineered shade structures for car park comprising tensile fabric fixed to steel framing fabricated in tubular steel sections.<br>Main Contractor: Al Mana Engineering<br>Year: 2008
  • Design, fabricate, paint, supply and erection of steel framing with Polyester reinforced PVC fabric Shade.<br>Main Contractor: KBAS Contracting, Trading & Industrial Co.<br>Year: 2009
  • Design, fabrication, supply and erection of Steel and stainless steel framing, decking and roof covering for access bridge. Bridge measuring 4.15 m wide x 3.765 high x17.58 m long<br>Main Contractor: HBK Contracting.<br>Year: 2003
  • Design, fabricate and erects the steelwork, cover and access stairs for the pedestrian bridge. Bridge 1 - 48 meters steelwork Bridge 2 - 33 meters, Width - 3.0 meters, Height - 6.0 meters clear to road. + 2.4 meters to tent roof.<br>Main Contractor: MARBU<br>Year: 2007
  • Design, fabrication, supply and erection of two link bridges, one at the second floor and one at the eighth floor. The bridges measure ~ 23 meters in length and stainless steel framing for the outer glass shell diameter of 4.86 meters.<br>Main Contractor: Khatib & Alami<br>Year: 2008
  • Steel work for bridge of 35.3 meters long and 5.2 meters wide. Which includes decking and floor framing, framing to support glass support sections, painting and erection. The support. Main beams are curved cell beams.<br>Main Contractor: Boom General Contractors.<br>Year: 2009
  • Design, fabrication, supply and erection of steel structure, Ga 1.0 z 35 TR60 composite metal deck and Stud Firing for steel bridges. Total no. Escape bridges - 11 Nos.<br>Main Contractor: Al Huda Engineering Works<br>Year: 2012
  • Design, fabricate, supply and erection of galvanized steel tower. Client: Ooredoo (Former Qtel)<br>Client: Ooredoo (Former Qtel)<br>Year: 1997
  • Design, fabrication, supply and erection of galvanized steel tower with guy support. Height: 100 Meters.<br>Client: DAGOC<br>Year: 2006
  • Design, fabricate, supply and erection of galvanized steel monopoles with caged ladder, platform and antenna support. Height: 30Mts<br>Client: Ooredoo (Former Qtel)<br>Year: 2003
  • Design, fabricate, paint, supply and erection of galvanized steel tower with caged ladder, platform with handrails and antenna support Height: 80 Meters<br>Client: Ooredoo (Former Qtel)<br>Year: 2008
  • Design, fabricate, supply and erect the steel framing for Conference Stairs, Building stairs. Comprises of Stair Columns, Stair Landing Platform, Stair Stringers, Tube Sections, Stair Steps, Bridge beams and Bridge Platform<br>Main Contractor: Redco Construction - Al Mana<br>Year: 2009
  • Design, fabricate, paint, supply and erect steelwork for Galvanised and painted steel spiral staircase and stainless steel grade 316-L hand rail and posts. Staircase: 59 steps and 1 landing with center column Ø 610 mm x 11.95 meters<br>Main Contractor: Consolidated Contractors Group & Teyseer Contracting Co. J.V<br>Year: 2010
  • Design, fabrication, supply and installation of brass decorative railing for primary stair. Including brass guarding rods between brass top and bottom plate with special patinated finish.<br>Main Contractor: Carillion Qatar<br>Year: 2015
  • Design, fabricate, supply and installation of steel work framings for the QP District Auditorium Project (Grand Staircase at Auditorium).<br>Main Contractor: MIDMAC<br>Year: 2013
  • Design, fabricate, supply and installation of stainless steel work supporting, glass steps and glass side walls for the spiral staircase.<br>Main Contractor: REDCO - Al Mana<br>Year: 2011
  • Design, fabrication, supply, delivery and installation of stainless steel staircase, ladders and handrails for pump stations<br>Main Contractor: Al Jaber Engg<br>Year: 2012
  • Design, fabricate, paint, supply and erect steel work for the spiral staircase. The staircase is approximately 7.0 meter outside diameter and 2.95 meter inside diameter with two flights. Works includes Steel. Main Framing, Trays for casting the concrete and Welding of glass fixing receiver to the stringer.<br>Main Contractor: Man Enterprises<br>Year: 2016
  • Design, Fabrication, supply and Erection of louvered wall for transformers at Al Khissa North.<br>Main Contractor: BUTEC<br>Year: 2009
  • Design, Fabrication, supply and Erection of Anodised Aluminium Louvers for 4 substations at Ezdan<br>Main Contractor: Aljaber Partners<br>Year: 2010
  • Design, fabrication, supply and Erection of Aluminium Louvers for 4 substations at Ezdan<br>Main Contractor: Gulf Contracting Co.<br>Year: 2010
  • Design, fabricate, supply and fix Stainless steel covers to circular columns in mirror polished and brush finish.<br>Main Contractor: GETTCO<br>Year: 2000
  • Design Fabricate and erect Steel Framed domes comprising Pipe sections for the Tower and Hotel and rolled I / Tube sections for the apartment domes. Tower office dome of 20 meter Diameter x 15.6 meters high, Hotel Domes of 15meter Dia x 11.6 meter high - 2Nos. Apartment Domes of 7.8meter Dia x 6meter high - 8Nos.<br>Main Contractor: AluTech<br>Year: 2003
  • Fabricate, supply and erection of steel structure for. Main Gazebo, Annex Gazebo, Side Gazebo and Steel panels.<br>Main Contractor: REDCO - AL MANA<br>Year : 2009
  • Design, Fabrication, supply and Erection of stainless steel canopy with water proofing sealant.<br>Main Contractor: Hyundai<br>Year: 2011
  • Design, Fabrication, supply and Erection of brass gates and wall panels with patina finish. Both slide open and swing open brass door system can be operated automatically and manually. 11 Nos. of entrance gates and 2 Wall panels<br>Main Contractor: Hyundai<br>Year: 2011
  • Fabrication, Patination and Supply of 2CR12 Panels.<br>Contractor: Almana Maples<br>Year: 2012
  • Steel Framing and anchor supports for Chandeliers at Sheraton<br>Main Contractor: Urbacon Trdg & Contg.<br>Year: 2014
  • Fabrication, supply and erection Cool Pool Bollard with K21 Greek Onyx and electrics with cam lock tray and S.S. connection box.<br>Main Contractor: Carillion Qatar, HBK Contracting.<br>Year: 2015
  • Fabrication, supply and installation of Stainless Steel wall panel light feature.<br>Main Contractor: HASSANESCO Trading and Contracting Co.<br>Year: 2015
  • Design, fabricate, supply and erection of dome structure with decking, rock wool insulation, water proofing and GRP panel.<br>Main Contractor: BOOM General Contractors<br>Year: 2016
Pages
  • Home
  • About us
  • Services
  • Projects
  • Contact us
Contact Address
Metalex Trading & Contracting Co. W.L.L.
P.O. Box: 40710,
Street No. 12, Building No. 203,
Zone 81, New Industrial Area,
Doha, Qatar
Contact Numbers
(+974) 4460 2343
(+974) 4460 6579
(+974) 4450 3122
metalex@qatar.net.qa
metalex1@gmail.com
Membership & Registrations
ISO 9001:2015, ISO 18001:2007, ISO 14001:2015

© Metalex 2025 All right reserved.